Andy Tran

University Seventh-day
Adventist Church

Becsys5 Installation And Technical Manual -

To build a program:

Chemical tank is empty; feeder pump lost prime; setpoint threshold set too narrow.

To prevent catastrophic chemical spills caused by sensor failures or sheared sample lines, configure the . Set a maximum allowable continuous runtime for each chemical feed relay (e.g., 60 minutes). If a pump runs continuously for this duration without hitting the setpoint, the BECSys5 will trip an alarm, cut power to the respective relay, and require a manual reset. 7. Troubleshooting Common Error Codes and Faults Symptom / Error Code Potential Root Cause Corrective Action "Low Flow" / No Flow Alarm becsys5 installation and technical manual

"Sarah, hand me the RS-232 to USB adapter. No, the other one. The one with the frayed cable."

Ensure the pool's chlorine and pH levels are stable and verified by a manual test kit. Navigate to > Calibration > ORP Calibration . To build a program: Chemical tank is empty;

Never hot-swap modules while the chassis is powered. Always disconnect the main 24 VDC supply before removal.

Connect the two wires to the flow safety terminals. This stops chemical feeding if the pool pump turns off. Relay Outputs pH Feed Pump: Wire the acid pump to the pH relay terminals. If a pump runs continuously for this duration

: Includes VFD control technology and Total Dynamic Head (TDH) monitoring to optimize circulation pump efficiency.

: BACnet devices not discovered

The physical installation process involves mounting the control chassis, inserting I/O modules, and wiring field devices. Refer to the quick-start poster included with your shipment, but follow these steps for precision.